bridge using pc strand

Low relaxation pc strand

ISO 9001:2008, ISO14001:2004 Qualified ;
Low relaxation PC strand application for large-span bridges on railways and highway,rock-soil anchoring project,
multi-story industrial buildings,stadiums,coal mines,domes for nuclear power stations and etc.
Manufacturer comply to standard ASTM A416, BS5896, AS1311, JISG3536, ISO6934, EN10138

Low Relaxation PC Strand

Bonded post-tensioned concrete is the descriptive term for a method of applying compression after pouring concrete and the curing process (in situ). The concrete is cast around a plastic, steel or aluminium curved duct, to follow the area where otherwise tension would occur in the concrete element. A set of tendons are fished through the duct and the concrete is poured. Once the concrete has hardened, the tendons are tensioned by hydraulic jacks that react (push) against the concrete member itself. When the tendons have stretched sufficiently, according to the design specifications (see Hooke's law), they are wedged in position and maintain tension after the jacks are removed, transferring pressure to the concrete. The duct is then grouted to protect the tendons from corrosion. This method is commonly used to create monolithic slabs for house construction in locations where expansive soils (such as adobe clay) create problems for the typical perimeter foundation. All stresses from seasonal expansion and contraction of the underlying soil are taken into the entire tensioned slab, which supports the building without significant flexure. Post-tensioning is also used in the construction of various bridges, both after concrete is cured after support by falsework and by the assembly of prefabricated sections, as in the segmental bridge.
Among the advantages of this system over unbonded post-tensioning are:
Large reduction in traditional reinforcement requirements as tendons cannot destress in accidents.
Tendons can be easily "woven" allowing a more efficient design approach.
Higher ultimate strength due to bond generated between the strand and concrete.
No long term issues with maintaining the integrity of the anchor/dead end.

PC Strand Application

pix pix pix pix pix pix

PC Wire and Strand Specialist

PC 2-wire strand,   PC 3-wire Strand,

PC 7-wire strand,   PC 19-wire Strand,

Unbonded PC Strand,   PC wire Manufacturer

Contact us

Add: daqiuzhuan industry area Jinghai,Tianjin 301605,China

TEL:0086-22-2955681 FAX:0086-22-2639851

Email:sales@pc-strand-china.com